Beltway 8 Road Rehab

South Houston · 2022

21,500yards moved
78days on site
Hot mix + millingsmaterial
Harris County DOTclient

The job

A 78-day rehab on a stretch of South Beltway 8. Combined hot-mix surfacing and reclaimed asphalt millings for the shoulders.

DBE certification was a contract requirement. AJJA's DBE status checked that procurement box, but what mattered to the County PM was on-the-ground performance — and we delivered 21,500 yards without a single load rejected.

Repeat work followed on two more Harris County corridors.